Section 13.0 - Plans, Assembly Tolerances and Marking

ID #1135

I have a tower for which the plumb and twist was recently taken by a registered surveyor. The initial Plumb and twist for the first two sections are out by a significant amount. The first two sections were stick built and it looks like the concrete foundation is not level. Is there an exemption to cover this?

No, the Standard does not include such an exemption.

Tags: -

Related entries:

Last update: 2014-01-06 21:50
Author: John Erichsen
Revision: 1.1

Digg it! Share on Facebook Print this record Send FAQ to a friend Show this as PDF file
Propose a translation for Propose a translation for
Please rate this FAQ:

Average rating: 0 (0 Votes)

completely useless 1 2 3 4 5 most valuable

You cannot comment on this entry